Haleiwa Beach Park Stabilization | GCA Build Hawaii Award

Haleiwa Beach Park Stabilization | GCA Build Hawaii Award

September 29, 2021

The seawall on the shoreline at Haleiwa Beach Park progressively deteriorated over many years.  The seawall and the surrounding area were closed in April 2018 as a result of safety concerns from the destabilized structures, including the development of sinkholes and significant erosion.  Sea Engineering Inc. served as the design-build contractor for the emergency stabilization of the seawall fronting Haleiwa Beach Park.  The project included:

  • Damage assessment
  • Structural and geotechnical investigations
  • Preparation of concept designs
  • Detailed designs
  • Permitting
  • Construction.

The General Contractors Association selected Sea Engineering’s Haleiwa Beach Park Emergency Stabilization project as the winner of the 2020 Merit Award!

Haleiwa Beach Park Historic Wall Repairs

Haleiwa Beach Park Historic Wall Repairs

 

 

ServicesServicesServicesServicesServicesServicesServicesServicesServicesServicesServices