Hunters Point Naval Shipyard is a former Navy installation located on a peninsula in the South San Francisco Bay. The facility was closed in 1991 under the Defense Base Realignment and Closure Act of 1990 (BRAC) and is in the process of conversion to non-military use. Historical site activities at HPS resulted in the release of chemicals to the environment, including offshore sediments. Environmental restoration activities are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA).

During the Pre-Feasibility Study (FS) phase of the restoration activities, Sea Engineering, Inc. (SEI) personnel teamed with Battelle Memorial Institute to develop an FS workplan and conduct sediment and contaminant transport studies. The studies included coring to determine sediment erosion rates, modeling of sediment transport potential, and modeling of long-term contaminant transport. In conjunction with previous work conducted by SEI in the Validation Study, the analysis was used in a ‘weight of evidence’ framework to determine the potential for sediment and contaminant transport under typical and extreme site conditions. Ultimately, the data is being used in evaluating the most efficient remedial design for the site (FS).

More Marine Environmental Studies Projects

Project Sea Engineering Service
Hunters Point

Hunters Point Shipyard Feasibility Study

Customer: Tetra Tech EMI
Start Year: 2005
Location: San Francisco,
Marine Environmental Studies
Newport Bay

Newport Bay Sediment Analysis

Customer: City of Newport Beach
Start Year: 2007
Location: Newport Beach,
Marine Environmental Studies
San Francisco Bay Bridge Environmental Monitoring

San Francisco Bay Bridge Environmental Monitoring

Customer: California Department of Transportation
Start Year: 2003
Location: San Francisco Bay,
Marine Environmental Studies
Contaminated Sediment Cleanup Monitoring

Contaminated Sediment Cleanup Monitoring

Customer: US EPA; Battelle
Start Year: 2007
Location: Ashtabula River,
Marine Environmental Studies
Santa Cruz Inner Harbor Dredging Project

Santa Cruz Inner Harbor Dredging Project

Customer: Santa Cruz Harbor District
Start Year: 2005
Location: Santa Cruz,
Marine Environmental Studies
The Geomorphology, Hydrodynamics, and Inlet Stability of Elkhorn Slough

The Geomorphology, Hydrodynamics, and Inlet Stability of Elkhorn Slough

Customer: Elkhorn Slough National Estuarine Research Reserve
Start Year: 2005
Location: Watsonville,
Marine Environmental Studies
Ocean Pointe Coastal Study

Ocean Pointe Coastal Study

Customer: Planning Solutions, Inc.
Start Year: 2005
Location: Oahu,
Coastal Engineering
Marine Environmental Studies
Cedar Lake Feasibility Study

Cedar Lake Feasibility Study

Customer: Sandia National Laboratories; USACE
Start Year: 2007
Location: Cedar Lake,
Marine Environmental Studies
South San Francisco Bay Sedflume Study

South San Francisco Bay Sedflume Study

Customer: USGS
Start Year: 2006
Location: San Francisco Bay,