Recent Posts

November 8, 2019
Kuhio Beach Stub Groin Erosion Remediation

Kuhio Beach Stub Groin Erosion Remediation

Sea Engineering is providing coastal engineering and permitting services for the construction of a 2.5m³ ElcoRock groin at Kuhio Beach.    

August 15, 2019
PBN’s Fastest 50 for 2019: No. 29 Sea Engineering, Inc.

PBN’s Fastest 50 for 2019: No. 29 Sea Engineering, Inc.

July 20, 2019
2019 July Update – USS Memorial Repair

2019 July Update – USS Memorial Repair

The National Park Service has posted some great videos of the USS Arizona Memorial work, with one showcasing our crew and boat, the Huki Pau. Sea Engineering was awarded a contract to assist with repairs to the Arizona Memorial Floating dock. Sea Engineering was contracted to remove the existing dock, demo the existing chain mooring […]

July 1, 2019
Persistent Environmental Monitoring Near an Operational Wave Energy Converter

Persistent Environmental Monitoring Near an Operational Wave Energy Converter

Sea Engineering is honored to have been part of this team. SEI provided logistics, personal and equipment to install the Fred Olsen Bolt Lifesaver wave energy device and support APL and the University of Washington with their WAMP system.

June 9, 2019
Hawaii allocates $13M to keep Waikiki Beach from disappearing

Hawaii allocates $13M to keep Waikiki Beach from disappearing

June 5, 2019
Haleiwa Seawall Repairs

Haleiwa Seawall Repairs

March 15, 2019
Congrats to Million-Dollar Wave Energy Winner

Congrats to Million-Dollar Wave Energy Winner

SEI receives a notable mention in the March 13, 2019 edition of the Windward Oahu Voice. Click title above and go to page three for an article on our collaboration with the University of Hawaii National Energy Institute on the million-dollar wave energy converter project.  

January 27, 2016
Proposal to Stabilize Waikiki Shoreline Moves Forward

Proposal to Stabilize Waikiki Shoreline Moves Forward